Featured Image

Episode 16: REFLECTION

As more eyes turn to pipeline resistance in Virginia, how does that resistance take root, and in what ways can community subvert the structures of power? Original air date: 4/20/18

Featured Image

Episode 15: TWO TREES pt. 2

Treesitters on top of Peters Mountain Stand have wondered if their action might be a spark to inspire pipeline fighters. Now others have answered their call, taking to the trees in the wetlands of Bent Mountain. Original air date: 4/6/18

Featured Image

Episode 14: TWO TREES

Through wind storms, snow storms, two court hearings, and a temporary restraining order, the support for the treesitters at Peters Mountain Stand has only grown. Have they sparked something beyond just protecting these two trees? Original air date: 3/30/18

Featured Image

Episode 13: BENT MOUNTAIN

A special episode of storytelling and memory sharing from residents of Bent Mountain. Original air date: 3/2/18

Featured Image

Episode 12: IRREPARABLE

In this first episode of 2018, the pipeline fight is entering a new phase. Tree cutting begins in Buckingham County, and MVP takes nearly 300 landowners to court. Original air date: 2/16/18

Featured Image

Episode 11: VOICE

Inside the State Water Control Board meetings for the Mountain Valley and Atlantic Coast Pipelines, where many opponents thought a vote in favor of water certification was a foregone conclusion for both projects, a chorus of voice makes space for courage and power. Original air date: 12/15/17

Featured Image

Episode 10: WATERSHED

In this episode, we visit Bottom Creek, one of the few Tier 3 streams in Virginia which would be crossed by the MVP, while pipeline opponents examine whether the DEQ’s process has really been “scientific and transparent” for the public. Original Air Date: 12/01/17